Jaipur: The Water Resources Department has launched the info of the whole filling capability of the dams of Rajasthan. 84.59 p.c of the whole filling capability of the dams of Rajasthan has come within the dams. The dams of Jodhpur division have additionally obtained extra water than final 12 months.
69.47 p.c of the whole filling capability of the dams in Jodhpur division has been stuffed. 94.07 p.c of the whole filling capability of the dams in Banswara division has been stuffed. 89.97 p.c of the whole filling capability of the dams in Kota division has been stuffed.
The dams of Jaipur division have gotten 82.24 p.c of their whole filling capability. The dams of Udaipur division have gotten 69.03 p.c of their whole filling capability. So far this monsoon, 381 dams of the water sources division have overflowed.
The strategy of draining out water from downstream of Bisalpur dam continues on the eighth day:
If we speak about Bisalpur dam, the method of draining out water from the downstream of Bisalpur dam is happening for the eighth day. Water is being drained downstream by opening 6 gates of the dam. Water is being drained out by opening 6 gates of the dam at a peak of 1 meter every. 36 thousand cusecs of water is being drained out from the dam. The peak of Triveni within the filling space of the dam is 4.10 meters.
#Jaipur: Big replace associated to water sources division
84.59 p.c of the whole filling capability of the dams of the state is crammed with water, the dams of Jodhpur division even have extra water than final 12 months…#RajasthanWithFirstIndia @RajGovOfficial @journovinod_ pic.twitter.com/pplx2uZNms
— First India News (@1stIndiaNews) September 13, 2024